I was wondering if it is at all possible to change the document type. There are times when I dump things into myinfo as a regular document, but then would like to change it to a task. If its not possible I'll add it to the suggestion list.

Thanks, Alan
Dr.J
Posts: 45
Joined: Fri Aug 24, 2007 3:11 am

Post by Dr.J »

Just add a due date as an attribute in the task panel or in a column. That converts it automatically to a task. When you clear the due date (and "started on" date, if there is one) in the attributes it reverts to being a document. That could be improved but works for now.
port80
Posts: 14
Joined: Sun Aug 12, 2007 9:00 pm

Post by port80 »

Works for me. I don't do it that often. Sometimes I've typed a lot of text and don't want to redo it. Cool.